Title
Great Sacred Hall After Construction Is Completed
Creator
Kosei Publishing Company
Date Created
1982-02-05
Language
jpn
Spatial Information
Suginami Ward/Great Sacred Hall
Googleコード
Description
The Great Sacred Hall renovation work that has been going on for about two years since August 1980 has been completed with September 1982. (Omitted) As an environmental improvement measure, we installed an electric precipitator in the air conditioner to increase air cleaning power, and performed forced ventilation in each room to improve the indoor environment. In addition, places where large numbers of believers gather, such as pews, are equipped with automatic temperature control devices to maintain a preset temperature. As mentioned above, various facilities were renovated to maximize efficiency with rationalization and energy conservation in mind. ("Kosei Yearbook 1983" P31)